Summit Commercial Electric LLC

Fleet & Commercial Plan · $799/mo

Commercial takeoff workspace · Fleet & multi-site ready

Blueprints

12

This month

Hours saved

186

Estimator time

Pipeline

$2,400,000

Active bids

Seats

8

Licensed users

Marketing

Riverside Fleet Service Center — Phase 2

AI-assisted quantity survey · Resend delivers bid packages when a client email is provided.

Total estimated material

$68,490

Direct material before markup

Total labor hours

412.5 hrs

Labor cost $45,375

Suggested winning bid

$128,400

Riverside Fleet Service Center — Phase 2

Previewing sample fleet electrical takeoff. Drop your own PDF to run live gpt-4o parsing (requires OPENAI_API_KEY and database).

Blueprint upload

Drag & drop commercial blueprints here

Sheet sets, risers, and details for electrical, plumbing, HVAC, or roofing scopes. Up to 25MB per file.

PDF
PNG / JPG

Takeoff results

Commercial electrical rough-in and gear scope derived from sheet E1–E4. Assumes 85% drawing completeness; verified panel schedule A3.

CategoryDescription & specsQty & unitMaterialLabor hrsLine total
Distribution

800A switchboard, 3PH, NEMA 1, 42-circuit

Unit cost $18,400.00 · 18.0 hrs / unit

1 EA$18,400.0018.0 hrs$22,300.00
Conduit

3/4" EMT homerun — office lighting zones

Unit cost $2.45 · 0.0 hrs / unit

2840 LF$6,958.0039.8 hrs$9,820.00
Devices

20A duplex receptacles, spec BR-204

Unit cost $28.00 · 0.3 hrs / unit

186 EA$5,208.0065.1 hrs$9,850.00
Lighting

2x4 LED troffer, 40W, 4000K, cat. L-12

Unit cost $118.00 · 1.1 hrs / unit

124 EA$14,632.00136.4 hrs$17,940.00
Feeders

#2/0 cu THHN feeder w/ PVC underground

Unit cost $12.80 · 0.1 hrs / unit

640 LF$8,192.0051.2 hrs$12,480.00